Select Publications

Journal articles

Chen W; Tseng CL; Yang SJS, 2020, 'Improving hand hygiene process compliance through process monitoring in healthcare', Manufacturing and Service Operations Management, vol. 22, pp. 669 - 682, http://dx.doi.org/10.1287/msom.2018.0768

Yao F; Wang J; Wen F; Tseng C-L; Zhao X; Wang Q, 2019, 'An Integrated Planning Strategy for a Power Network and the Charging Infrastructure of Electric Vehicles for Power System Resilience Enhancement', Energies, vol. 12, pp. 3918 - 3918, http://dx.doi.org/10.3390/en12203918

Lin H; Wang C; Wen F; Tseng CL; Hu J; Ma L; Fan M, 2019, 'Risk-limiting real-time economic dispatch in a power system with flexibility resources', Energies, vol. 12, http://dx.doi.org/10.3390/en12163133

Deng Q; Feng C; Wen F; Tseng CL; Wang L; Zou B; Zhang X, 2019, 'Evaluation of accommodation capability for electric vehicles of a distribution system considering coordinated charging strategies', Energies, vol. 12, http://dx.doi.org/10.3390/en12163056

Chen K; Wen F; Tseng CL; Chen M; Yang Z; Zhao H; Shang H, 2019, 'A game theory-based approach for vulnerability analysis of a cyber-physical power system', Energies, vol. 14, http://dx.doi.org/10.3390/en12153002

Xu Y; Wen F; Tseng CL; Yang Z; Chen M; Zhao H; Shang H, 2019, 'Cooperative Control for Damping Inter-Area Oscillations Using Dynamic State Information', IEEE Access, vol. 7, pp. 77877 - 77884, http://dx.doi.org/10.1109/ACCESS.2019.2922732

Zhan Y; Zheng QP; Tseng C-L; Pasiliao EL, 2018, 'An accelerated extended cutting plane approach with piecewise linear approximations for signomial geometric programming', Journal of Global Optimization, vol. 70, pp. 579 - 599, http://dx.doi.org/10.1007/s10898-017-0563-4

Sundararajan SK; Tseng CL, 2017, 'Managing Project Performance Risks under Uncertainty: Using a Dynamic Capital Structure Approach in Infrastructure Project Financing', Journal of Construction Engineering and Management, vol. 143, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001341

Zhang Y; Zhang Y; Wen F; Chung CY; Tseng CL; Zhang X; Zeng F; Yuan Y, 2016, 'A fuzzy Petri net based approach for fault diagnosis in power systems considering temporal constraints', International Journal of Electrical Power and Energy Systems, vol. 78, pp. 215 - 224, http://dx.doi.org/10.1016/j.ijepes.2015.11.095

Li Y; Tseng CL; Hu G, 2015, 'Is now a good time for Iowa to invest in cellulosic biofuels? A real options approach considering construction lead times', International Journal of Production Economics, vol. 167, pp. 97 - 107, http://dx.doi.org/10.1016/j.ijpe.2015.05.019

Tseng C-L; Zhan Y; Zheng QP; Kumar M, 2015, 'A MILP formulation for generalized geometric programming using piecewise-linear approximations', European Journal of Operational Research, vol. 245, pp. 360 - 370, http://dx.doi.org/10.1016/j.ejor.2015.01.038

Motamarri S; Akter S; Ray P; Tseng C-L, 2014, 'Distinguishing "mHealth" from other healthcare services in a developing country: A study from the service quality perspective', Communications of the Association for Information Systems, vol. 34, pp. 669 - 692, http://aisel.aisnet.org/cais/vol34/iss1/34

Geem ZW; Yang X-S; Tseng C-L, 2013, 'Harmony Search and Nature-Inspired Algorithms for Engineering Optimization', Journal of Applied Mathematics, vol. 2013, pp. 1 - 2, http://dx.doi.org/10.1155/2013/438158

Wang L; Tseng CL, 2012, 'Special issue on challenges and opportunities in the 21st century energy infrastructure', Journal of Energy Engineering, vol. 138, pp. 31 - 32, http://dx.doi.org/10.1061/(ASCE)EY.1943-7897.0000072

Chen Y; Tseng C, 2011, 'Inducing Clean Technology in the Electricity Sector: Tradable Permits or Carbon Tax Policies?', Energy Journal, vol. 32, pp. 149 - 174, http://dx.doi.org/10.5547/ISSN0195-6574-EJ-Vol32-No3-6

Tseng C; Zhu W, 2010, 'Optimal Self-Scheduling and Bidding Strategy of a Thermal Unit Subject to Ramp Constraints and Price Uncertainty', IET Generation Transmission and Distribution, vol. 4, pp. 125 - 137, http://dx.doi.org/10.1049/iet-gtd.2009.0048

Tseng C; Zhao T; Fu C, 2009, 'Contingency Estimation Using a Real Options Approach', Construction Management and Economics, vol. 27, pp. 1073 - 1087, http://dx.doi.org/10.1080/01446190903222411

Sauma E; Tseng C, 2009, 'Multiple Perspectives in Power Transmission Expansion Planning under Environmental Awareness', Journal of Energy Engineering - ASCE, vol. 135, pp. 53 - 54, http://dx.doi.org/10.1061/(ASCE)0733-9402(2009)135:3(53)

Tseng C; Zhu W; Dmitriev A, 2009, 'Variable Capacity Utilization, Ambient Temperature Shocks and Generation Asset Valuation', Energy Economics, vol. 31, pp. 888 - 896, http://dx.doi.org/10.1016/j.eneco.2009.05.013

Tseng C; Chen Y, 2008, 'Climate policies and the power sector: Challenges and issues', Journal of Energy Engineering - ASCE, vol. 134, pp. 31 - 32, http://dx.doi.org/10.1061/(ASCE)0733-9402(2008)134:2(31)

Tseng C; Lin K, 2007, 'A Framework Using Two-Factor Price Lattices for Generation Asset Valuation', Operations Research, vol. 55, pp. 234 - 251, http://dx.doi.org/10.1287/opre.1060.0355

Chowdhury ; Tseng C, 2007, 'Distributed Energy Resources: Issues and Challenges', Journal of Energy Engineering - ASCE, vol. 133, pp. 109 - 110

Zhao T; Tseng C, 2007, 'Flexible Facility Interior Layout: A Real Options Approach', Journal of the Operational Research Society, vol. 58, pp. 729 - 739, http://dx.doi.org/10.1057/palgrave.jors.2602189

Zhu W; Tseng C, 2007, 'Valuing Fuel Switching Units Using Least Squares Monte Carlo Approach', Pacific Journal of Optimization, vol. 3, pp. 459 - 475, http://www.ybook.co.jp/online2/oppjo/vol3/p459.html

Tseng C; Lin K; Sundararajan S, 2005, 'Managing Cost Overrun Risks in Project Funding Allocation', Annals of Operations Research, vol. 135, pp. 127 - 153, http://dx.doi.org/10.1007/s10479-005-6238-4

Tseng C, 2005, 'New Modeling Tools for Energy Markets', Journal of Energy Engineering - ASCE, vol. 131, pp. 97 - 97

Tseng C, 2005, 'New Modeling Tools for Energy Systems', Journal of Energy Engineering - ASCE, vol. 131, pp. 1 - 1, http://dx.doi.org/10.1061/(ASCE)0733-9402(2005)131:1(1)

Zhao T; Sundararajan S; Tseng C, 2004, 'Highway Development Decision-Making under Uncertainty: A Real Options Approach', Journal of Infrastructure Systems, vol. 10, pp. 23 - 32, http://dx.doi.org/10.1061/(ACSE)1076-0342(2004)10:1(23)

Zhao T; Tseng C, 2003, 'A Note on Activity Floats in Activity-on-Arrow Networks', Journal of the Operational Research Society, vol. 54, pp. 1296 - 1299, http://www.jstor.org/stable/4101792

Zhao T; Tseng C, 2003, 'Valuing Flexibility in Infrastructure Expansion', Journal of Infrastructure Systems, vol. 9, pp. 89 - 97, http://dx.doi.org/10.1061/(ASCE)1076-0342(2003)9:3(89)

Tseng C; Barz G, 2002, 'Short-Term Generation Asset Valuation: A Real Options Approach', Operations Research, vol. 50, pp. 297 - 310, http://www.jstor.org/stable/3088497

Tseng C; Li C; Oren SS, 2000, 'Solving the Unit Commitment Problem by a Unit Decommitment Method', Journal of Optimization Theory and Applications, vol. 105, pp. 707 - 730, http://dx.doi.org/10.1023/A:1004653526131

Tseng C; Oren SS; Cheng CS; Li C; Svoboda AJ; Johnson RB, 1999, 'A Transmission-Constrained Unit Commitment Method in Power System Scheduling', Decision Support Systems, vol. 24, pp. 297 - 310

Tseng C; Oren SS; Svoboda AJ; Johnson RB, 1999, 'Price-based Adaptive Spinning Reserve Requirements in Power System Scheduling', International Journal of Electrical Power and Energy Systems, vol. 21, pp. 137 - 145

Li C; Johnson RB; Svoboda AJ; Tseng C; Hsu E, 1998, 'A Robust Unit Commitment Algorithm for Hydro-Thermal Optimization', IEEE Transactions on Power Systems, vol. 13, pp. 1051 - 1056, http://dx.doi.org/10.1109/59.709098


Back to profile page