ORCID as entered in ROS

Select Publications
Ruprecht J; Tucker T; Coghlan I; Glamore W, 2020, Pampoolah Floodplain Remediation Investigation and Riverbank Vulnerability Assessment, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2019/18
Glamore W; Deiber M; Ruprecht J; Miller BM; Ferguson A, 2019, Hunter River Estuary Water Quality Model – Water Quality Model Calibration and Validation Report, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2018/40
Glamore W; Ruprecht J; Harrison AJ; Tucker TA; Rayner DS; Smith AN, 2018, Everlasting Swamp Hydrodynamic Modelling Study, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2017/02
Coghlan I; Carley JT; Harrison A; Howe D; Ruprecht J; Short AD; Flocard F; Rahman PF, 2017, Eurobodalla Coastal Hazard Assessment, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WR: 2017/09
Ruprecht JE, 2016, Evolution of Tidal Inlet Geometries in a Restored Coastal Wetland, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL Research Report, WRL RR260
Rayner D; Glamore W; Ruprecht J, 2016, Woodberry Swamp Hydrologic Study, Water Research Laboratory, Manly Vale, NSW, WRL Technical Report, WRL TR2016/03
Rayner D; Ruprecht J; Glamore W, 2016, Teal Lagoon Hydraulic Investigation, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL Technical Report, WRL TR2016/11
Glamore W; Ruprecht JE; Rayner DS, 2016, Lower Manning River Drainage Remediation Action Plan, Water Research Laboratory, UNSW Sydney, Manly Vale, WRL Technical Report, WRL TR2016/01
Glamore W; Ruprecht JE; Harrison AJ; Drummond CD, 2016, One Tree Reach Wetland: Remediation Option Assessment, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL Technical Report, WRL TR2016/09
Glamore W; Coghlan I; Ruprecht J, 2016, Clyde Terminal Conversion: Restoration of Green and Golden Bell Frog Habitat, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL Technical Report, WRL TR2016/06
Glamore W; Coghlan I; Ruprecht J, 2016, 2015 Riverbank Vulnerability Assessment using a Decision Support System: Seaham Weir Pool and Lower Williams River, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL Technical Report, WRL TR2015/02, http://www.rms.nsw.gov.au/documents/projects/hunter/williams-river/williams-river-erosion-study.pdf
Glamore W; Ruprecht JE; Rahman PF, 2015, Jersey Avenue Wetland Investigation, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2015/06
Glamore W; Coghlan IR; Ruprecht JE; Flocard F; Drummond CD, 2014, Riverbank Vulnerability Assessment using a Decision Support System: Clarence River (Rogans Bridge to Ulmarra), Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2014/12, http://maritimemanagement.transport.nsw.gov.au/documents/wrl-report-clarence-river.pdf
Glamore W; Ruprecht JE; Rayner DS, 2014, Wyong Salt Marsh Investigation, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2013/19
Glamore W; Coghlan IR; Ruprecht JE, 2014, Riverbank Vulnerability Assessment using a Decision Support System: Lower Hawkesbury River (Wisemans Ferry to Spencer), Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2014/04, http://www.hornsby.nsw.gov.au/__data/assets/pdf_file/0009/63774/WRL-Report-2014-04-Final.pdf
Ruprecht JE; Miller BM, 2014, Assessment of Destratification at Dungowan Reservoir, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2014/11
Drummond C; Ruprecht JE; Peirson WL, 2014, Redesign of the 1 Metre Wave Flume, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2013/25
Glamore W; Ruprecht JE; Rayner DS; Smith GP, 2014, Big Swamp Rehabilitation Project Hydrological Study, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2012/23
Flocard FD; Ruprecht ; Carley , 2013, Toogoom Rockwall Physical Modelling, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL 2013/21
Ruprecht JE; Miller ; Flocard , 2013, Extended Gravity Oil-Water Separation (EGOWS) System Design Manual, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW, Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2011/04
Rayner D; Glamore ; Ruprecht , 2013, Gumma Gumma Swamp Hydrologic Investigation, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale NSW 2093, WRL Technical Report, 2013/03
Coghlan IR; Ruprecht J; Blacka MJ, 2012, Abbot Point MCF 2D and Q3D Baseline Modelling Study, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2011/16
Rayner D; Miller BM; Flocard F; Ruprecht J; Rahman PF, 2012, Brooklyn and Dangar Island Outfall Dilution Study: 3rd and 8th May 2012, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2012/14
Ruprecht J; Blacka MJ, 2012, Gladstone Tug Berth Marina Physical Modelling, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2012/07
Timms WA; Ruprecht J; Greve AK, 2012, Hydraulic Conductivity Testing of Drill Core - Broken Hill MAR, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2011-30
Ruprecht J; Shand TD; Miller BM, 2012, Melville Bay - Wind Hindcasting, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2011/20
Smith G; Ruprecht J; Miller BM; Flocard F, 2011, Dye Tracer Testing of The Sydney Desalination Plant Outfall: 29th and 30th March 2011, WRL TR2011/08
Ruprecht J; Timms WA, 2011, Hat Head Effluent Disposal Scheme Ongoing Monitoring Results to September 2010, WRL TR2010/31
Pells SE; Tarrade L; Ruprecht J, 2011, Physical Model Testing of Adelaide Desalination Outlet Works, WRL TR2010/20