Process for outright renewal
In brief:
- The internal centre/institute completes the Renewal form (Appendix D) and submits it (with relevant attachments) for approval.
- The Office of the PVCR reviews the form and makes a recommendation to the DVC for approval and then advises the centre/institute's Presiding Faculty of the outcome.
See Section 4.2 of the UNSW Centres and Institutes Procedure for information about renewal.
Internal Centres/Institutes Categorised by Faculty as Requiring 'Review and Renewal'
Process for review & renewal
In brief:
- The internal centre/institute completes the Review form (Appendix C) and the Renewal form (Appendix D), and submits the documentation package to the faculty ahead of a scheduled review panel meeting.
- The centre/institute director presents at the review panel meeting to discuss the centre/institute's achievements and respond to questions.
- The faculty, working with PVCR (Senior Project Officer, PVCR), prepares a report to submit to the DVC level for approval.
- The outcome is advised to the Presiding Faculty.
- See Section 4.2 of the UNSW Centres and Institutes Procedure for information about renewal, and about review panel meetings.
Internal Centres/Institutes Categorised by Faculty as Requiring Closure
Process for closure
In brief:
- The faculty, on behalf of the internal centre/institute, contacts PVCR for approval of the closure in principle.
- Once approval in principle is granted, the faculty and centre/institute complete the Closure form (Appendix E), and submit the signed and initialled form to PVCR for finalisation at the DVC level.
See Section 5 of the UNSW Centres and Institutes Procedure for information about closure of an internal centre or institute.