Select Publications
Reports
2012, Generic Design Coastal Erosion Volumes and Setbacks for Australia, Water Research Laboratory, UNSW Australia, Manly Vale, Australia, WRL RR247, http://www.acecrc.org.au/access/repository/resource/b7a73710-3cb0-1030-998b-40404adc5e91
,2012, Identification of Coastal Hazard Risk Areas to Projected Sea Level Rise for the Manly Local Government Area, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2011/19
,2012, Investigation of Roches Beach Protection Works, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2012/09
,2012, Joint Probability Assessment of NSW Extreme Waves and Water Levels, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2011/29
,2012, Manly LGA Seawall Risk Assessment and Plan for Priority Upgrade/Replacement, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2012/02
,2012, New Brighton Beach Scraping Trial: Analysis of Dune and Beach Profile Data, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR 2011/26
,2012, Port Fairy Wave Power Resource Analysis, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL TR2011/27
,2012, Review of Storm Surge and Coastal Inundation Modelling, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL Technical Report, WRL TR2010/18
,2011, Investigation of Trial Groyne Structures for Roches Beach, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL Technical Report, WRL TR2011/06
,2011, Dune Building using Beach Scraping at Cremorne Ocean Beach and Roches Beach, Clarence City, Tasmania, WRL TR2009/31
,2011, Inundation Levels for George River Floodplain, St Helens, Tasmania, WRL TR2010/04
,2011, NSW Coastal Inundation Hazard Study: Coastal Storms and Extreme Waves, WRL TR2010/16, http://www.environment.nsw.gov.au/research-and-publications/publications-search/nsw-coastal-inundation-hazard-study-coastal-storms-and-extreme-waves
,2011, Peer Review of Black Head to Crowdy Head Coastline Hazard Definition Study and Management Options Study, 2010/21
,2011, Peer Review of Reports Regarding Erosion at the Detention River, Hellyer, Tasmania, WRL TR2010/26
,2011, Physical Modelling for James Price Point, Browse LNG Development, WRL TR2011/14
,2011, Research Report: Coastal Storm Data Analysis: Provision of Extreme Wave Data for Adaptation Planning, WRL RR242
,2011, Roches Beach Coastal Hazard Lines Reassessment, WRL TR2011/05
,2011, St Kilda Southern Breakwater: 2D Physical Model Testing, WRL TR2010/33
,2011, Task 1, Brunei, Review of Coastal Processes for Brunei, WRL TR2010/17
,2011, Task 6, Design of Seaward Extent of River Training Walls and Sand Bypassing Tutong River Estuary, Brunei, WRL TR2009/24
,2011, Task 8, Tutong Estuary, Brunei, Physical Modelling of Training Walls, WRL TR2010/29
,2011, Task3, Kuala Belait Brunei, Beach Drain Outfalls and Beach Profile Variations, Long Term Shoreline Analysis and Outfall Pipeline Concept, WRL TR2009/26
,2010, Coastal Risk Management Report for the North Palm Beach Surf Live Saving Clubhouse, Palm Beach, WRL Technical Report 2010/22, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL TR2010/22
,2010, Design Setbacks for Coastal Land, WRL Technical Report 2008/25, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL TR2008/25
,2010, High Resolution Wave Modelling (HI-WAM) for Batemans Bay Detailed Wave Study, WRL Technical Report 2010/19, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL Technical Report, WRL TR2010/19
,2010, Mornington Pier Upgrade: 2D Physical Model Testing, WRL Technical Report 2010/08, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL Technical Report, WRL TR2010/08
,2010, Pittwater Estuarine Risk Management Report for Proposed Boatshed at 165 Riverview Road, Clareville, WRL Technical Report 2010/07, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL Technical Report, WRL TR2010/07
,2010, Update of Tweed Shire Coastal Hazard Lines, WRL Technical Report 2010/11, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL Technical Report, WRL TR2010/11
,