Select Publications
Journal articles
2024, 'Resilience and systems- A traffic flow case example', Journal of Infrastructure Preservation and Resilience, 5, http://dx.doi.org/10.1186/s43065-024-00097-w
,2023, 'Sustainable production of buildings based on Iranian vernacular patterns: A water footprint analysis', Building and Environment, 242, http://dx.doi.org/10.1016/j.buildenv.2023.110605
,2023, 'Resilience and Systems—A Building Structure Case Example', Buildings, 13, http://dx.doi.org/10.3390/buildings13061520
,2022, 'Stability and Resilience—A Systematic Approach', Buildings, 12, http://dx.doi.org/10.3390/buildings12081242
,2022, 'Resilience and Systems—A Review', Sustainability (Switzerland), 14, http://dx.doi.org/10.3390/su14148327
,2022, 'Intelligent Stochastic Agent-Based Model for Predicting Truck Production in Construction Sites by Considering Learning Effect', Journal of Construction Engineering and Management, 148, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0002264
,2022, 'Automatic Mass Estimation of Construction Vehicles by Modeling Operational and Engine Data', Journal of Construction Engineering and Management, 148, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0002225
,2022, 'Appropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters', Journal of Construction Engineering and Management, 148, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0002228
,2022, 'Labour productivity in Australian building construction projects: a roadmap for improvement', International Journal of Construction Management, 22, pp. 2079 - 2088, http://dx.doi.org/10.1080/15623599.2020.1765286
,2021, 'Carbon value engineering: A framework for integrating embodied carbon and cost reduction strategies in building design', Building and Environment, 192, pp. 107620, http://dx.doi.org/10.1016/j.buildenv.2021.107620
,2021, 'At one with systems', Civil Engineering and Environmental Systems, 38, pp. 265 - 268, http://dx.doi.org/10.1080/10286608.2021.1980542
,2021, 'Author's reply to: David Blockley's discussion of the special issue', Civil Engineering and Environmental Systems, 38, pp. 250, http://dx.doi.org/10.1080/10286608.2021.1980550
,2021, 'Author’s reply to: David Elms’ discussion of ‘a framework for a civil engineering BOK’', Civil Engineering and Environmental Systems, 38, pp. 276 - 278, http://dx.doi.org/10.1080/10286608.2021.1980549
,2021, 'BOK and terminology', Civil Engineering and Environmental Systems, 38, pp. 257 - 258, http://dx.doi.org/10.1080/10286608.2021.1980543
,2020, 'ANN-based prediction intervals to forecast labour productivity', Engineering, Construction and Architectural Management, 27, pp. 2335 - 2351, http://dx.doi.org/10.1108/ECAM-08-2019-0406
,2020, 'Author's reply to: David Elms’ discussion of ‘Bias and decision making–an overview systems explanation’', Civil Engineering and Environmental Systems, 37, pp. 146 - 148, http://dx.doi.org/10.1080/10286608.2020.1821671
,2020, 'Optimum Outcome-Sharing Construction Contracts with Multiagent and Multioutcome Arrangements', Journal of Construction Engineering and Management, 146, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001862
,2020, 'The impact of value engineering on embodied greenhouse gas emissions in the built environment: A hybrid life cycle assessment', Building and Environment, 168, pp. 106452 - 106452, http://dx.doi.org/10.1016/j.buildenv.2019.106452
,2020, 'A framework for a civil engineering systems BOK', Civil Engineering and Environmental Systems, 37, pp. 154 - 165, http://dx.doi.org/10.1080/10286608.2020.1815012
,2020, 'An optimum multiple outcomes sharing model with multiple risk-averse agents', Engineering, Construction and Architectural Management, 28, pp. 2788 - 2810, http://dx.doi.org/10.1108/ECAM-03-2020-0194
,2019, 'A hybrid approach for quantitative assessment of construction projects risks: The case study of poor quality concrete', Computers and Industrial Engineering, 131, pp. 306 - 319, http://dx.doi.org/10.1016/j.cie.2019.03.045
,2019, 'Bias and decision making – an overview systems explanation', Civil Engineering and Environmental Systems, pp. 1 - 14, http://dx.doi.org/10.1080/10286608.2020.1744133
,2019, 'Concreting operations – the relationship between unit costs and unit emissions', International Journal of Construction Management, 19, pp. 427 - 435, http://dx.doi.org/10.1080/15623599.2018.1452095
,2019, 'Hybrid Fuzzy-System Dynamics Approach for Quantificatiion of the Impacts of Construction Claims', Engineering, Construction and Architectural Management, 26, pp. 1261 - 1276, http://dx.doi.org/10.1108/ECAM-08-2017-0150
,2019, 'Organisations as Systems - Difficulties in Model Development and Validation', Civil Engineering and Environmental Systems, 35, pp. 41 - 56, http://dx.doi.org/10.1080/10286608.2019.1577395
,2019, 'Single Treatment of PPP Road Project Options', Journal of Construction Engineering and Management, 145, pp. 04018122-1 - 04018122-11, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001591
,2019, 'The relationship between heavy equipment cost efficiency and cleaner production in construction', Journal of Cleaner Production, 211, pp. 521 - 529, http://dx.doi.org/10.1016/j.jclepro.2018.11.167
,2018, 'A utility measure of attitudes to lower-emissions production in construction', Journal of Cleaner Production, 202, pp. 23 - 32, http://dx.doi.org/10.1016/j.jclepro.2018.08.086
,2018, 'Emissions and Production Penalties/Bonuses Associated with Non-standard Earthmoving Loading Policies', Construction Innovation, 18, pp. 227 - 245, http://dx.doi.org/10.1108/CI-05-2017-0047
,2018, 'Uncertainties related to financial variables within infrastructure life cycle costing: a literature review', Structure and Infrastructure Engineering, 14, pp. 1233 - 1243, http://dx.doi.org/10.1080/15732479.2017.1418008
,2018, 'Valuing Deliberate Built-in Flexibility in Houses - Exampled', International Journal of Strategic Property Management, 22, pp. 479 - 488, http://dx.doi.org/10.3846/ijspm.2018.6273
,2017, 'Adjustments within discount rates to cater for uncertainty—Guidelines', Engineering Economist, 62, pp. 322 - 335, http://dx.doi.org/10.1080/0013791X.2016.1245376
,2016, 'A cash flow view of real options', Engineering Economist, 61, pp. 265 - 288, http://dx.doi.org/10.1080/0013791X.2016.1157661
,2016, 'A proposed framework for assessing the sustainability of infrastructure', International Journal of Construction Management, 16, pp. 281 - 298, http://dx.doi.org/10.1080/15623599.2016.1146115
,2016, 'An examination of the DRET model and the influence of payload, haul grade and truck type on earthmoving emissions', International Journal of Construction Management, 16, pp. 95 - 108, http://dx.doi.org/10.1080/15623599.2015.1130600
,2016, 'Emission and cost effects of training for construction equipment operators: A field study', Smart and Sustainable Built Environment, 5, pp. 96 - 110, http://dx.doi.org/10.1108/SASBE-11-2015-0040
,2016, 'Measuring project sustainability maturity level - A fuzzy-based approach', International Journal of Sustainable Development, 19, pp. 76 - 100, http://dx.doi.org/10.1504/IJSD.2016.073680
,2016, 'Optimal Outcome Sharing with a Consortium of Contractors', Journal of Civil Engineering and Management, 22, pp. 655 - 665, http://dx.doi.org/10.3846/13923730.2014.914086
,2016, 'Risk – a commentary', Civil Engineering and Environmental Systems, 33, pp. 177 - 198, http://dx.doi.org/10.1080/10286608.2016.1202932
,2016, 'The financial additionality and viability of CDM projects allowing for uncertainty', Environment, Development and Sustainability, 18, pp. 129 - 141, http://dx.doi.org/10.1007/s10668-015-9630-5
,2016, 'The impact of ESG disclosures and institutional ownership on market information asymmetry', Asia-Pacific Journal of Accounting and Economics, 23, pp. 432 - 448, http://dx.doi.org/10.1080/16081625.2016.1170100
,2015, 'A Note on Equivalent Fixed Rate and Variable Rate Loans; Borrower's Perspective', The Engineering Economist, 60, pp. 155 - 162, http://dx.doi.org/10.1080/0013791X.2014.973985
,2015, 'Construction contracts with conversion capability: a way forward', Journal of Financial Management of Property and Construction, 20, pp. 132 - 146, http://dx.doi.org/10.1108/JFMPC-10-2014-0022
,2015, 'Improving the attractiveness of CDM projects through allowing and incorporating options', Energy Policy, 86, pp. 784 - 791, http://dx.doi.org/10.1016/j.enpol.2015.08.024
,2015, 'Incorporating resilience through adaptability and flexibility', Civil Engineering and Environmental Systems, 32, pp. 31 - 43, http://dx.doi.org/10.1080/10286608.2015.1016921
,2015, 'Risk in Stream and Royalty Financing of Infrastructure Development', Journal of Infrastructure Development, 1, pp. 23 - 40, http://www.csidui.org/csid-01-03/
,2014, 'Optimum scraper load time and fleet size for minimum emissions', International Journal of Construction Management, 14, pp. 209 - 226, http://dx.doi.org/10.1080/15623599.2014.967924
,2014, 'An optimal target cost contract with a risk neutral owner', Engineering, Construction and Architectural Management, 21, pp. 586 - 604, http://dx.doi.org/10.1108/ECAM-01-2013-0003
,2014, 'Interest rate uncertainty and investment value: a second order moment approach', International Journal of Engineering Management and Economics, 4, pp. 176 - 176, http://dx.doi.org/10.1504/ijeme.2014.066588
,2014, 'Optimal Sharing Arrangement for Multiple Project Outcomes', Journal of Financial Management of Property and Construction, 19, pp. 264 - 280, http://dx.doi.org/10.1108/JFMPC-09-2013-0038
,