Select Publications

Journal articles

Hosseinian SM; Carmichael DG, 2014, 'Optimum Sharing in Project Delivery Methods', International Journal of Engineering Management and Economics, 4, pp. 151 - 175, http://dx.doi.org/10.1504/IJEME.2014.066586

Carmichael DG; Bartlett BJ; Kaboli AS, 2014, 'Surface mining operations: coincident unit cost and emissions', International Journal of Mining, Reclamation and Environment, 28, pp. 47 - 65, http://dx.doi.org/10.1080/17480930.2013.772699

Kaboli AS; Carmichael DG, 2014, 'Truck Dispatching and Minimum Emissions Earthmoving', Smart and Sustainable Built Environment, 3, pp. 170 - 186, http://dx.doi.org/10.1108/SASBE-10-2013-0050

Tran H; Carmichael DG, 2013, 'A Contractor's Classification of Owner Payment Practices', Engineering, Construction and Architectural Management, 20, pp. 29 - 45, http://www.emeraldinsight.com/journals.htm?issn=0969-9988&volume=20&issue=1&articleid=17069262&show=abstract

Siew RYJ; Balatbat MCA; Carmichael DG, 2013, 'A Review of Building/Infrastructure Sustainability Reporting Tools (SRTs)', Smart and Sustainable Built Environment, 2, pp. 106 - 139, http://dx.doi.org/10.1108/SASBE-03-2013-0010

Hosseinian SM; Carmichael DG, 2013, 'An Optimal Incentive Contract with a Risk-Neutral Contractor', Journal of Construction Engineering and Management - ASCE, 139, pp. 899 - 909, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000663

Hosseinian SM; Carmichael DG, 2013, 'Optimal Gainshare/Painshare in Alliance Projects', Journal of the Operational Research Society, 64, pp. 1269 - 1278, http://dx.doi.org/10.1057/jors.2012.146

Carmichael DG, 2013, 'The Conceptual Power of Control Systems Theory in Engineering Practice', Civil Engineering and Environmental Systems: decision making and problem solving, 30, pp. 231 - 242, http://dx.doi.org/10.1080/10286608.2013.865021

Siew RYJ; Balatbat MCA; Carmichael DG, 2013, 'The Relationship between Sustainability Practices and Financial Performance of Construction Companies', Smart and Sustainable Built Environment, 2, pp. 6 - 27, http://dx.doi.org/10.1108/20466091311325827

Tran H; Carmichael DG, 2012, 'Contractor's Financial Estimation Based on Owner Payment Histories', Organization, Technology and Management in Construction: An International Journal, 4, pp. 481-489, http://otmcj.grad.hr/clanci/vol4_is2/vol4_is2_4.htm

Kaboli AS; Carmichael DG, 2012, 'Emission and Cost Configurations in Earthmoving Operations', Organization, Technology and Management in Construction: An International Journal, 4, pp. 393 - 402, http://www.grad.hr/otmcj/

Balatbat MC; Findlay E; Carmichael DG, 2012, 'Performance Risk Associated with Renewable Energy CDM Projects', Journal of Management in Engineering, 28, pp. 51 - 58, http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000090

Tran H; Carmichael DG, 2012, 'Stationarity of the Transition Probabilities in the Markov Chain Formulation of Owner Payments on Projects', ANZIAM Journal, 53, pp. C69 - C89, http://journal.austms.org.au/ojs/index.php/ANZIAMJ/article/view/5111%7D%20%5BApril%2028,%202012

Tran H; Carmichael DG; (Highly Commended Paper Award) , 2012, 'The Likelihood of Subcontractor Payment; Downstream Progression via the Owner and Contractor', Journal of Financial Management of Property and Construction, 17, pp. 135 - 152, http://www.emeraldinsight.com/journals.htm?articleid=17045667&ini=aob

Carmichael DG, 2011, 'An alternative approach to capital investment appraisal', Engineering Economist, 56, pp. 123 - 139, http://dx.doi.org/10.1080/0013791X.2011.573616

Carmichael DG, 2011, 'An Alternative Approach to Capital Investment Appraisal', The Engineering Economist, 56, pp. 123 - 139, http://dx.doi.org/10.1080/0013791X2011.573616

Balatbat MCA; Lin C; Carmichael DG, 2011, 'Management Efficiency Performance of Construction Businesses – Australian Data', Engineering, Construction and Architectural Management, 18, pp. 140 - 158, http://dx.doi.org/10.1108/09699981111111120

Carmichael DG; Balatbat MCA, 2011, 'On the Analysis of Property Unit Sales over Time', International Journal of Strategic Property Management, 15, pp. 329 - 339, http://dx.doi.org/10.3846/1648715X.2011.631765

Carmichael DG; Hersh AM; Parasu P, 2011, 'Real Options Estimate Using Probabilistic Present Worth Analysis', The Engineering Economist, 56, pp. 295 - 320, http://dx.doi.org/10.1080/0013791X.2011.624259

Carmichael DG; Balatbat MCA, 2011, 'Risk Associated with Managed Investment Primary Production Projects', International Journal of Project Organisation and Management, 3, pp. 273 - 289, http://dx.doi.org/10.1504/IJPOM.2011.042033

Carmichael DG; Balatbat MCA, 2010, 'A Contractor's Analysis of the Likelihood of Payment of Claims', Journal of Financial management of property and construction, 15, pp. 102 - 117, http://dx.doi.org/10.1108/13664381011063412

Carmichael DG; Balatbat MCA, 2010, 'A Review and Study of Project Investment Cash Flow Correlations', International Journal of Project Planning and Finance, 1, pp. 1 - 21, http://www.cidighana.org/pages/index.php?siteid=cidighana&page=current-issue

Johar K; Carmichael DG; Balatbat MCA, 2010, 'A Study of Correlation Aspects in Probabilistic NPV Analysis', The Engineering Economist, 55, pp. 181 - 199, http://dx.doi.org/10.1080/0013791x.2010.481185

Balatbat MCA; Lin C; Carmichael DG, 2010, 'Australian Construction Growth Ratios: Industry and Company Analyses', The International Journal of Construction Management, 10, pp. 23 - 43, http://dx.doi.org/10.1080/15623599.2010.10773153

Balatbat MCA; Lin C; Carmichael DG, 2010, 'Comparative Performance of Publicly Listed Construction Companies: Australian Evidence', Construction Management and Economics, 28, pp. 919 - 932, http://dx.doi.org/10.1080/01446193.2010.501805

Carmichael DG, 2009, 'Comments on Delay Analysis Methods in Resolving Construction Claims', International Journal of Construction Management, 9, pp. 1 - 28, http://dx.doi.org/10.1080/15623599.2009.10773118

Vu AT; Carmichael DG, 2009, 'Cultural Difference and Conflict Management - A Vietnamese-Australian and Construction Industry Case Study', International Journal of Construction Management, 9, pp. 1 - 19, http://dx.doi.org/10.1080/15623599.2009.10773125

Carmichael DG; Balatbat MC, 2008, 'Probabilistic DCF Analysis and Capital Budgeting and Investment - A Survey', The Engineering Economist, 53, pp. 84 - 102, http://dx.doi.org/10.1080/00137910701864809

Carmichael DG; Balatbat MCA, 2008, 'The Influence of extra projects on overall investment feasibility', Journal of Financial Management of Property and Construction, 13, pp. 161 - 174, http://dx.doi.org/10.1108/13664380810913403

Carmichael DG, 1998, 'Gurus of faddish management', Journal of Project and Construction Management, 4, pp. 77 - 84

Carmichael DG, 1998, 'On risk terminology', Journal of Project and Construction Management, 4, pp. 101 - 109

Carmichael DG, 1997, 'Management fads', Journal of Project and Construction Management, pp. 115 - 125

Carmichael DG, 1997, 'Re-engineering and work study', Journal of Project and Construction Management, 3, pp. 95 - 107

Carmichael DG, 1996, 'Flat organisational structures', Journal of Project and Construction Management, 2, pp. 61 - 68

Carmichael DG, 1996, 'Management Fads', Journal of Project and Construction Management, 3, pp. 115 - 125

Carmichael DG, 1996, 'On project objectives and constraints', Journal of Project and Construction Management, 2, pp. 63 - 71

Al-Sadek O; Carmichael DG, 1992, 'On simulation in planning networks', Civil Engineering and Environmental Systems: decision making and problem solving, pp. 59 - 68

Carmichael DG, 1991, 'Approximations for heterogeneous finite source queues', Civil Engineering and Environmental Systems: decision making and problem solving, 8, pp. 174 - 178

Carmichael DG, 1990, 'Bang-bang control in optimum structural design', Engineering Optimization, 15, pp. 205 - 209

Carmichael DG, 1990, 'Heterogeneity in deterministic finite source queues', Civil Engineering and Environmental Systems: decision making and problem solving, 17, pp. 11 - 19

Carmichael DG, 1990, 'Structural optimization and system dynamics', Structural Optimization, 2, pp. 105 - 108, http://dx.doi.org/10.1007/BF01745457

Carmichael DG, 1988, 'Queue simulation of cyclic construction operations', Civil Engineering and Environmental Systems: decision making and problem solving, 5, pp. 213 - 219

Carmichael DG, 1987, 'A refined queuing model for earthmoving operations', Civil Engineering and Environmental Systems: decision making and problem solving, 4, pp. 153 - 159

Carmichael DG, 1987, 'Machine interference with general repair and running times', Zeitschrift fur Operations Research, 31, pp. B115 - B133, http://dx.doi.org/10.1007/BF01258142

Carmichael DG, 1987, 'On the equivalence of the (Eh/M/c) and (M/M/c) finite source queues', Civil Engineering and Environmental Systems: decision making and problem solving, 4, pp. 87 - 93

Carmichael DG, 1987, 'Optimal pusher-scraper loading policies', Civil Engineering and Environmental Systems: decision making and problem solving, 12, pp. 255 - 267

Tarranza NC; Carmichael DG, 1986, 'A multicriteria approach to the marking-up of a bid', Engineering Costs and Production Economics, 10, pp. 139 - 153, http://dx.doi.org/10.1016/0167-188X(86)90008-X

Tarranza NC; Carmichael DG, 1986, 'A multicriteria approach to the marking-up of a bid', Engineering Costs and Production Economics, 10, pp. 139 - 153, http://dx.doi.org/10.1016/0167-188X(86)90035-2

Carmichael DG, 1986, 'Erlang loading models in earthmoving', Civil Engineering and Environmental Systems: decision making and problem solving, 3, pp. 118 - 124

Carmichael DG, 1986, 'Optimal shovel-truck operations', Engineering Optimization, 10, pp. 51 - 64


Back to profile page