Select Publications

Journal articles

Shirowzhan S; Sepasgozar SME, 2019, 'Spatial analysis using temporal point clouds in advanced GIS: Methods for ground elevation extraction in slant areas and building classifications', ISPRS International Journal of Geo-Information, 8, http://dx.doi.org/10.3390/ijgi8030120

Liu C; Shirowzhan S; Sepasgozar S; Kaboli S, 2019, 'Evaluation of Classical Operators and Fuzzy Logic Algorithms for Edge Detection of Panels at Exterior Cladding of Buildings', Buildings, 9, pp. 40 - 40, http://dx.doi.org/10.3390/buildings9020040

Tao X; Li H; Mao C; Wang C; Hui Yap JB; Sepasgozar S; Shirowzhan S; Rose T, 2019, 'Developing Shuffled Frog-Leaping Algorithm (SFLA) Method to Solve Power Load-Constrained TCRTO Problems in Civil Engineering', Advances in Civil Engineering, 2019, http://dx.doi.org/10.1155/2019/1404636

Sepasgozar SME; Davis S, 2019, 'Digital construction technology and job-site equipment demonstration: Modelling relationship strategies for technology adoption', Buildings, 9, http://dx.doi.org/10.3390/BUILDINGS9070158

Tahmasebinia F; Fogerty D; Wu LO; Li Z; Sepasgozar SME; Zhang K; Sepasgozar S; Marroquin FA, 2019, 'Numerical analysis of the creep and shrinkage experienced in the Sydney Opera House and the rise of digital twin as future monitoring technology', Buildings, 9, http://dx.doi.org/10.3390/BUILDINGS9060137

Tahmasebinia F; Niemelä M; Ebrahimzadeh Sepasgozar S; Lai TY; Su W; Reddy KR; Shirowzhan S; Sepasgozar S; Marroquin FA, 2018, 'Three-Dimensional Printing Using Recycled High-Density Polyethylene: Technological Challenges and Future Directions for Construction', Buildings, 8, pp. 165 - 165, http://dx.doi.org/10.3390/buildings8110165

Sepasgozar SME; Davis SR; Loosemore M, 2018, 'Dissemination Practices of Construction Sites' Technology Vendors in Technology Exhibitions', Journal of Management in Engineering, 34, http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000650

Sepasgozar S; Forsythe P; Shirowzhan S, 2018, 'Evaluation of Terrestrial and Mobile Scanner Technologies for Part-Built Information Modeling', Journal of Construction Engineering and Management, 144, pp. 04018110-1 - 04018110-12, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001574

Shirowzhan S; Sepasgozar S; Li H; Trinder J, 2018, 'Spatial compactness metrics and Constrained Voxel Automata development for analyzing 3D densification and applying to point clouds: A synthetic review', Automation in Construction, 96, pp. 236 - 249, http://dx.doi.org/10.1016/j.autcon.2018.09.018

Sepasgozar S; Hawken S; Sargolzaei S; Foroozanfad M, 2018, 'Implementing citizen centric technology in developing smart cities: A model for predicting the acceptance of urban technologies', Technological Forecasting and Social Change, 142, pp. 105 - 116, http://dx.doi.org/10.1016/j.techfore.2018.09.012

Sepasgozar SME; Davis S; Loosemore M; Bernold L, 2018, 'An investigation of modern building equipment technology adoption in the Australian construction industry', Engineering, Construction and Architectural Management, 25, pp. 1075 - 1091, http://dx.doi.org/10.1108/ECAM-03-2017-0052

Ullah F; Sepasgozar S; Wang C, 2018, 'A Systematic Review of Smart Real Estate Technology: Drivers of, and Barriers to, the Use of Digital Disruptive Technologies and Online Platforms', Sustainability, 10, pp. 3142, http://dx.doi.org/10.3390/su10093142

Ullah F; Thaheem MJ; sepasgozar SME; Forcada N, 2018, 'System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors', Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 4, pp. 1 - 1, http://dx.doi.org/10.1061/(ASCE)LA.1943-4170.0000280

Didehvar N; Teymourifard M; Mojtahedi M; Sepasgozar S, 2018, 'An investigation on Virtual Information Modeling acceptance based on project management knowledge areas', Buildings, 8, pp. 80, http://dx.doi.org/10.3390/buildings8060080

Sepasgozar SM; Davis STEVE, 2018, 'Construction Technology Adoption Cube: An Investigation on Process, Factors, Barriers, Drivers and Decision Makers Using NVivo and AHP Analysis', Buildings, http://dx.doi.org/10.3390/buildings8060074

Sepasgozar SM; Davis STEVEN; Li H; Luo X, 2018, 'Modeling the Implementation Process for New Construction Technologies: Thematic Analysis Based on Australian and U.S. Practices', Journal of Management in Engineering, http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000608

Didehvar N; Teymourifard M; Mojtahedi M; Sepasgozar S, 2018, 'An Investigation on Virtual Information Modeling Acceptance Based on Project Management Knowledge Areas', , http://dx.doi.org/10.20944/preprints201805.0024.v1

Sepasgozar S; Davis S, 2018, 'Construction Technology Adoption Cube: An Investigation on Process, Factors, Barriers, Drivers, and Decision Makers using NVivo and AHP Analysis', , http://dx.doi.org/10.20944/preprints201805.0281.v1

Sepasgozar S; Shirowzhan S; Wang CC, 2017, 'A Scanner Technology Acceptance Model for Construction Projects', Procedia Engineering, 180, pp. 1237 - 1246, http://dx.doi.org/10.1016/j.proeng.2017.04.285

Sepasgozar SME; Loosemore M, 2017, 'The role of customers and vendors in modern construction equipment technology diffusion', Engineering, Construction and Architectural Management, 24, pp. 1203 - 1221, http://dx.doi.org/10.1108/ECAM-06-2016-0149

Hong Y; Hammad A; Sepasgozar S; Akbar Nezhad A, 2017, 'BIM Adoption Model for Small and Medium Construction Organisations in Australia', Engineering, Construction and Architectural Management, accepted for publication, in press, pp. 154 - 183, http://dx.doi.org/10.1108/ECAM-04-2017-0064

Sepasgozar SME; Loosemore M; Davis SR, 2016, 'Conceptualising information and equipment technology adoption in construction A critical review of existing research', Engineering, Construction and Architectural Management, 23, pp. 158 - 176, http://dx.doi.org/10.1108/ECAM-05-2015-0083

Sepasgozar SME; Bliemel MJ; Bemaian M, 2015, 'Discussion of “Barriers of Implementing Modern Methods of Construction” by M. Motiar Rahman', Journal of Management in Engineering, 32, http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000410

Shahbazi S; Sepasgozar S; Shahbazi B, 2015, 'Assessment of User Comfort Aspects of Industrialized Building Systems using PROMETHEE and Delphi', Modular and Offsite Construction (MOC) Summit Proceedings, pp. 31 - 38, http://dx.doi.org/10.29173/mocs194

Sepasgozar SME; Shiran GR; Barati K; Siew RYJ, 2015, 'Modelling International Project Feasibility of Sustainable Construction Management: Case Study of Tele-Communication Towers', Modular and Offsite Construction (MOC) Summit Proceedings, pp. 121 - 129, http://dx.doi.org/10.29173/mocs195

Barati K; Sepasgozar SM, 2015, 'Factors affecting on productivity of oil and gas construction projects: an AHP analysis', American Journal of Civil Engineering and Architecture, http://dx.doi.org/10.12691/ajcea-3-1-4

Sepasgozar SM; Barati K, 2015, 'The Importance of New Technology for Delay Mitigation in Construction Projects', American Journal of Civil Engineering and Architecture, http://dx.doi.org/10.12691/ajcea-3-1-3

Shiran GR; Barati K; Sepasgozar SM, 2015, 'Selecting Optimal Project Delivery System for Infrastructural Projects Using Analytic Hierarchy Process', American Journal of Civil Engineering and Architecture, http://dx.doi.org/10.12691/ajcea-3-6-4

Sepasgozar ; Bliemel , 2014, 'Barriers of Implementing Modern Methods of Construction', Journal of Management in Engineering, 30, pp. 69 - 77, http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000173

Sepasgozar S; Bernold L, 2013, 'Engineering Sketching: A Valuable Teaching Tool in Construction', Australasian Journal of Construction Economics and Building - Conference Series, 1, pp. 62 - 62, http://dx.doi.org/10.5130/ajceb-cs.v1i1.3156

Sepasgozar SME; Leonhard EB, 2012, 'Engineering Sketching – A Valuable Teaching Tool in Construction', Australasian Journal of Construction Economics and Building, 1, pp. 62 - 72, http://hdl.handle.net/10453/19728


Back to profile page