Select Publications

Journal articles

Abdel-Basset M; Chang V; Hawash H; Chakrabortty RK; Ryan M, 2020, 'Deep-IFS: Intrusion Detection Approach for IIoT Traffic in Fog Environment', IEEE Transactions on Industrial Informatics, pp. 1 - 1, http://dx.doi.org/10.1109/tii.2020.3025755

Hossain MA; Chakrabortty RK; Ryan M; Pota HR, 2020, 'Energy Management of Community Microgrids Considering Uncertainty using Particle Swarm Optimisation', , http://dx.doi.org/10.20944/preprints202006.0205.v1

Lodi KA; Ali M; Tariq M; Meraj M; Iqbal A; Chakrabortty RK; Ryan MJ, 2020, 'Modulation with Metaheuristic Approach for Cascaded-MPUC49 Asymmetrical Inverter with Boosted Output', IEEE Access, pp. 1 - 12, http://dx.doi.org/10.1109/access.2020.2995782

Pervez I; Pervez A; Tariq M; Sarwar A; Chakrabortty RK; Ryan M, 2020, 'Rapid and Robust Adaptive Jaya (Ajaya) based Maximum Power Point Tracking of a PV-based Generation System', IEEE Access, pp. 1 - 1, http://dx.doi.org/10.1109/access.2020.3028609

Mathew M; Chakrabortty RK; Ryan MJ, 2020, 'Selection of an Optimal Maintenance Strategy Under Uncertain Conditions: An Interval Type-2 Fuzzy AHP-TOPSIS Method', IEEE Transactions on Engineering Management, pp. 1 - 14, http://dx.doi.org/10.1109/tem.2020.2977141

Abdel-Basset M; Mohamed R; Mirjalili S; Chakrabortty RK; Ryan M, 2020, 'Solar photovoltaic parameter estimation using an improved equilibrium optimizer', Solar Energy, 209, pp. 694 - 708, http://dx.doi.org/10.1016/j.solener.2020.09.032

Rahman MHF; Chakrabortty R; Ryan M, 2019, 'Memetic Algorithm for Solving Resource Constrained Project Scheduling Problems', Automation in Construction, 111, pp. 1 - 18, http://dx.doi.org/10.1016/j.autcon.2019.103052

Pakdaman M; Dokhtzaynal V; Abbasi A; Chakrabortty R, 2019, 'How an Enterprise Project Management Office (EPMO) can enhance organisational performance through the right members?', Project Governance and Controls Annual Review, 2, pp. 1 - 11, https://www.pgcs.org.au/index.php/download_file/view/401/184/

Chakrabortty RK; Abbasi A; Ryan MJ, 2019, 'A Risk Assessment Framework for Scheduling Projects With Resource and Duration Uncertainties', IEEE Transactions on Engineering Management, pp. 1 - 15, http://dx.doi.org/10.1109/TEM.2019.2943161

Jahangoshai Rezaee M; Yousefi S; Chakrabortty RK, 2019, 'Analysing causal relationships between delay factors in construction projects', International Journal of Managing Projects in Business, http://dx.doi.org/10.1108/ijmpb-01-2019-0020

Chakrabortty RK; Sarker RA; Essam DL, 2018, 'Single mode resource constrained project scheduling with unreliable resources', Operational Research, 20, pp. 1 - 35, http://dx.doi.org/10.1007/s12351-018-0380-7

Chakrabortty RK; Sarker RA; Essam DL, 2017, 'Resource constrained project scheduling with uncertain activity durations', Computers and Industrial Engineering, 112, pp. 537 - 550, http://dx.doi.org/10.1016/j.cie.2016.12.040

Chakrabortty RK; Sarker RA; Essam DL, 2016, 'Multi-mode resource constrained project scheduling under resource disruptions', Computers and Chemical Engineering, 88, pp. 13 - 29, http://dx.doi.org/10.1016/j.compchemeng.2016.01.004

Chakrabortty RK; Hasin MAA; Sarker RA; Essam DL, 2015, 'A possibilistic environment based particle swarm optimization for aggregate production planning', Computers and Industrial Engineering, 88, pp. 366 - 377, http://dx.doi.org/10.1016/j.cie.2015.07.021

Chakrabortty RK; Sarker R; Essam D, 2014, 'Event Based Approaches for Solving Multi-mode Resource Constraints Project Scheduling Problem', Lecture Notes in Computer Science, 8838, pp. 375 - 386, http://dx.doi.org/10.1007/978-3-662-45237-0_35

Chakrabortty RK; Asadujjaman M; Nuruzzaman M, 2014, 'Fuzzy and AHP approaches for designing a hospital bed: A case study in Bangladesh', International Journal of Industrial and Systems Engineering, 17, pp. 315 - 328, http://dx.doi.org/10.1504/IJISE.2014.062541

Chakrabortty RK; Hasin MAA, 2013, 'Solving an Aggregate Production Planning Problem by Fuzzy Based Genetic Algorithm (FBGA) Approach', International Journal of Fuzzy Logic Systems, 3, pp. 1 - 16, https://wireilla.com/papers/ijfls/V3N1/3113ijfls01.pdf

Chakrabortty RK; Akhtar Hasin MA, 2013, 'Solving an aggregate production planning problem by using multi-objective genetic algorithm (MOGA) approach', International Journal of Industrial Engineering Computations, 4, pp. 1 - 12, http://dx.doi.org/10.5267/j.ijiec.2012.09.003

Chakrabortty R; Hossain MM; Azad MFH; Islam MJ, 2013, 'Analysing the Effects of Sales Promotion and Advertising on Consumer’s Purchase Behaviour', World Journal of Social Sciences, 3, pp. 183 - 194

Chakrabortty R; Biswas TK; Ahmed I, 2013, 'Reducing Process Variability by Using DMAIC Model: A Case Study in Bangladesh', International Journal for Quality Research

Haque KMA; Chakrabortty R; Hossain MM; Mondal P; Islam SA, 2012, 'Implementation of Lean tools in RMG sector through Value Stream Mapping for increasing value added activities', World Journal of Social Sciences, 2, pp. 225 - 234

Khaled AA; Paul SK; Chakrabortty R; Salauddinn A, 2011, 'Selection of suppliers through different multicriteria decision making techniques', Global Journal of Management and Business Research, 11, pp. 1 - 11

Chakrabortty R; Paul SK, 2011, 'Study and Implementation of Lean Manufacturing in a Garment Manufacturing Company: Bangladesh Perspective', Journal of Optimization in Industrial Engineering, 7, pp. 11 - 22


Back to profile page