Select Publications
Book Chapters
2014, 'House of Quality and Comparative Assessment of Health-Care Services', in Adibi S (ed.), mHealth Multidisciplinary Verticals, CRC Press, Boca Raton, FL, pp. 571 - 590, http://dx.doi.org/10.1201/b17724-40
,, 2014, 'House of Quality and Comparative Assessment of Health-Care Services', in mHealth Multidisciplinary Verticals, CRC Press, pp. 571 - 590, http://dx.doi.org/10.1201/b17724-32
2014, 'House of Quality and Comparative Assessment of Health-Care Services', in mHealth Multidisciplinary Verticals, pp. 571 - 590, http://dx.doi.org/10.1201/b17724-35
,2011, 'Optimization in Construction and Project Management', in Geem ZW (ed.), Optimization in Civil and Environmental Engineering, Old City Publishing, Inc., USA, pp. 9 - 58
,2009, 'Harmony Search Algorithms for Water and Environmental Systems', in Geem ZW (ed.), Music-Inspired Harmony Search Algorithm, Springer-Verlag, Berlin Heidelberg, pp. 113 - 127, http://dx.doi.org/10.1007/978-3-642-00185-7_7
,2003, 'Power Plant Operations and Real Options', in Ronn EI (ed.), Real Options and Energy Management, Risk Books, London, UK, pp. 255 - 280
,Journal articles
2024, 'Temporal distance in dual sourcing: A behavioural investigation', Managerial and Decision Economics, 45, pp. 5757 - 5766, http://dx.doi.org/10.1002/mde.4353
,2024, 'Pride or Guilt? Impacts of Consumers' Socially Influenced Recycling Behaviors on Closed-Loop Supply Chains', Manufacturing and Service Operations Management, 26, pp. 2067 - 2084, http://dx.doi.org/10.1287/msom.2023.0721
,2024, 'Scenario-Based Optimal Real-Time Charging Strategy of Electric Vehicles with Bayesian Long Short-Term Memory Networks', Journal of Modern Power Systems and Clean Energy, 12, pp. 1572 - 1583, http://dx.doi.org/10.35833/MPCE.2023.000512
,2023, 'The Impact of Healthcare Delivery Complexity on Practices for Clinical Quality Improvement: A Case of Healthcare Workers' Hand Hygiene Compliance', Service Science, 15, pp. 283 - 301, http://dx.doi.org/10.1287/SERV.2023.0323
,2023, 'Best practices for implementing biosafety inspections in a clinical laboratory: Evidence from a multi-site experimental study', PLoS ONE, 18, http://dx.doi.org/10.1371/journal.pone.0292940
,2023, 'Sustainable Supplier Selection under Financial Hardships: The Conflicting Impact of Spatial and Temporal Psychological Distances', Sustainability (Switzerland), 15, pp. 9561, http://dx.doi.org/10.3390/su15129561
,2023, 'Optimal Pricing Strategy for Data Center Considering Demand Response and Renewable Energy Source Accommodation', Journal of Modern Power Systems and Clean Energy, 11, pp. 345 - 354, http://dx.doi.org/10.35833/MPCE.2021.000130
,2023, 'Economic dispatch of CAES in an integrated energy system with cooling, heating, and electricity supplies', Energy Conversion and Economics, 4, pp. 61 - 72, http://dx.doi.org/10.1049/enc2.12077
,2022, 'Evaluating automatic hand hygiene monitoring systems: A scoping review', Public Health in Practice, 4, http://dx.doi.org/10.1016/j.puhip.2022.100290
,2021, 'What are healthcare workers' preferences for hand hygiene interventions? A discrete choice experiment', BMJ Open, 11, http://dx.doi.org/10.1136/bmjopen-2021-052195
,2021, 'How Much Do Negative Probabilities Matter in Option Pricing?: A Case of a Lattice-Based Approach for Stochastic Volatility Models', Journal of Risk and Financial Management, 14, http://dx.doi.org/10.3390/jrfm14060241
,2020, 'Improving hand hygiene process compliance through process monitoring in healthcare', Manufacturing and Service Operations Management, 22, pp. 669 - 682, http://dx.doi.org/10.1287/msom.2018.0768
,2019, 'An Integrated Planning Strategy for a Power Network and the Charging Infrastructure of Electric Vehicles for Power System Resilience Enhancement', Energies, 12, pp. 3918 - 3918, http://dx.doi.org/10.3390/en12203918
,2019, 'Risk-limiting real-time economic dispatch in a power system with flexibility resources', Energies, 12, http://dx.doi.org/10.3390/en12163133
,2019, 'Evaluation of accommodation capability for electric vehicles of a distribution system considering coordinated charging strategies', Energies, 12, http://dx.doi.org/10.3390/en12163056
,2019, 'A game theory-based approach for vulnerability analysis of a cyber-physical power system', Energies, 14, http://dx.doi.org/10.3390/en12153002
,2019, 'Cooperative Control for Damping Inter-Area Oscillations Using Dynamic State Information', IEEE Access, 7, pp. 77877 - 77884, http://dx.doi.org/10.1109/ACCESS.2019.2922732
,2018, 'An accelerated extended cutting plane approach with piecewise linear approximations for signomial geometric programming', Journal of Global Optimization, 70, pp. 579 - 599, http://dx.doi.org/10.1007/s10898-017-0563-4
,2017, 'Managing Project Performance Risks under Uncertainty: Using a Dynamic Capital Structure Approach in Infrastructure Project Financing', Journal of Construction Engineering and Management, 143, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001341
,2016, 'A fuzzy Petri net based approach for fault diagnosis in power systems considering temporal constraints', International Journal of Electrical Power and Energy Systems, 78, pp. 215 - 224, http://dx.doi.org/10.1016/j.ijepes.2015.11.095
,2015, 'Is now a good time for Iowa to invest in cellulosic biofuels? A real options approach considering construction lead times', International Journal of Production Economics, 167, pp. 97 - 107, http://dx.doi.org/10.1016/j.ijpe.2015.05.019
,2015, 'A MILP formulation for generalized geometric programming using piecewise-linear approximations', European Journal of Operational Research, 245, pp. 360 - 370, http://dx.doi.org/10.1016/j.ejor.2015.01.038
,2014, 'Distinguishing "mHealth" from other healthcare services in a developing country: A study from the service quality perspective', Communications of the Association for Information Systems, 34, pp. 669 - 692, http://aisel.aisnet.org/cais/vol34/iss1/34
,2013, 'From the New Editor in Chief', Journal of Energy Engineering, 139, pp. 1 - 1, http://dx.doi.org/10.1061/(asce)ey.1943-7897.0000108
,2013, 'Harmony Search and Nature-Inspired Algorithms for Engineering Optimization', Journal of Applied Mathematics, 2013, pp. 1 - 2, http://dx.doi.org/10.1155/2013/438158
,2012, 'Special issue on challenges and opportunities in the 21st century energy infrastructure', Journal of Energy Engineering, 138, pp. 31 - 32, http://dx.doi.org/10.1061/(ASCE)EY.1943-7897.0000072
,2011, 'Inducing Clean Technology in the Electricity Sector: Tradable Permits or Carbon Tax Policies?', Energy Journal, 32, pp. 149 - 174, http://dx.doi.org/10.5547/ISSN0195-6574-EJ-Vol32-No3-6
,2010, 'Optimal Self-Scheduling and Bidding Strategy of a Thermal Unit Subject to Ramp Constraints and Price Uncertainty', IET Generation Transmission and Distribution, 4, pp. 125 - 137, http://dx.doi.org/10.1049/iet-gtd.2009.0048
,2009, 'Contingency Estimation Using a Real Options Approach', Construction Management and Economics, 27, pp. 1073 - 1087, http://dx.doi.org/10.1080/01446190903222411
,2009, 'Multiple Perspectives in Power Transmission Expansion Planning under Environmental Awareness', Journal of Energy Engineering - ASCE, 135, pp. 53 - 54
,2009, 'Variable Capacity Utilization, Ambient Temperature Shocks and Generation Asset Valuation', Energy Economics, 31, pp. 888 - 896, http://dx.doi.org/10.1016/j.eneco.2009.05.013
,2008, 'Climate policies and the power sector: Challenges and issues', Journal of Energy Engineering - ASCE, 134, pp. 31 - 32
,2007, 'A Framework Using Two-Factor Price Lattices for Generation Asset Valuation', Operations Research, 55, pp. 234 - 251, http://dx.doi.org/10.1287/opre.1060.0355
,2007, 'Distributed Energy Resources: Issues and Challenges', Journal of Energy Engineering - ASCE, 133, pp. 109 - 110
,2007, 'Flexible Facility Interior Layout: A Real Options Approach', Journal of the Operational Research Society, 58, pp. 729 - 739, http://dx.doi.org/10.1057/palgrave.jors.2602189
,2007, 'Valuing Fuel Switching Units Using Least Squares Monte Carlo Approach', Pacific Journal of Optimization, 3, pp. 459 - 475, http://www.ybook.co.jp/online2/oppjo/vol3/p459.html
,2005, 'Managing Cost Overrun Risks in Project Funding Allocation', Annals of Operations Research, 135, pp. 127 - 153, http://dx.doi.org/10.1007/s10479-005-6238-4
,2005, 'New Modeling Tools for Energy Markets', Journal of Energy Engineering - ASCE, 131, pp. 97 - 97
,2005, 'New Modeling Tools for Energy Systems', Journal of Energy Engineering - ASCE, 131, pp. 1 - 1, http://dx.doi.org/10.1061/(ASCE)0733-9402(2005)131:1(1)
,2004, 'Highway Development Decision-Making under Uncertainty: A Real Options Approach', Journal of Infrastructure Systems, 10, pp. 23 - 32, http://dx.doi.org/10.1061/(ACSE)1076-0342(2004)10:1(23)
,2003, 'A Note on Activity Floats in Activity-on-Arrow Networks', Journal of the Operational Research Society, 54, pp. 1296 - 1299, http://www.jstor.org/stable/4101792
,2003, 'Valuing Flexibility in Infrastructure Expansion', Journal of Infrastructure Systems, 9, pp. 89 - 97, http://dx.doi.org/10.1061/(ASCE)1076-0342(2003)9:3(89)
,2002, 'Short-Term Generation Asset Valuation: A Real Options Approach', Operations Research, 50, pp. 297 - 310, http://www.jstor.org/stable/3088497
,2000, 'Solving the Unit Commitment Problem by a Unit Decommitment Method', Journal of Optimization Theory and Applications, 105, pp. 707 - 730, http://dx.doi.org/10.1023/A:1004653526131
,