Select Publications
Reports
2017, Eurobodalla Coastal Hazard Assessment, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WR: 2017/09
,2016, Kingscliff Beach Foreshore Protection Works Part B - Detailed Concept Terminal Seawall Design, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2014/15
,2016, Caseys Beach North Seawall Condition Assessment and Design Advice, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2016/10
,2016, Clyde Terminal Conversion: Restoration of Green and Golden Bell Frog Habitat, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2016/06
,2016, 2015 Riverbank Vulnerability Assessment using a Decision Support System: Seaham Weir Pool and Lower Williams River, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2015/02, http://dx.doi.org/10.26190/unsworks/27640, https://www.hunterwater.com.au/community/major-projects-in-your-area/seaham-weir-pool-erosion-management-plan
,2016, Chatham Islands Port Waitangi Physical Modelling, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2015/17
,2016, Coastal Hazard Management Study - Byron Bay Embayment, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2013/28, http://dx.doi.org/10.26190/unsworks/27647
,2016, Preliminary Testing of Oyster Bags, Water Research Laboratory, UNSW Sydney, Manly Vale, WRL TR2015/20, http://www.wrl.unsw.edu.au/sites/wrl/files/uploads/Projects/2016_WRL_2015-20_Preliminary_Testing_of_Oyster_Shell_Filled_Bags.pdf
,2015, Uncalibrated Modelling of Botany Bay Overflows, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2014/21
,2014, Riverbank Vulnerability Assessment using a Decision Support System: Clarence River (Rogans Bridge to Ulmarra), Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2014/12, http://maritimemanagement.transport.nsw.gov.au/documents/wrl-report-clarence-river.pdf
,2014, Hunter Valley Hydrodynamic Platform and Model Scoping Study, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2013/26
,2014, Kingscliff Beach Foreshore Protection Works Part C - Groyne Field Assessment, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2012/18
,2014, Riverbank Vulnerability Assessment using a Decision Support System: Lower Hawkesbury River (Wisemans Ferry to Spencer), Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2014/04, http://dx.doi.org/10.26190/unsworks/27646, http://www.hornsby.nsw.gov.au/__data/assets/pdf_file/0009/63774/WRL-Report-2014-04-Final.pdf
,2013, Caseys Beach Seawall Design, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2013/04
,2013, Future Coasts - Port Fairy Coastal Hazards Assessment, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, Australia, WRL TR2012/21, http://www.moyne.vic.gov.au/files/assets/public/documents/our-community/environment/portfairycoastalhazardassesment.pdf
,2012, Abbot Point MCF 2D and Q3D Baseline Modelling Study, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL TR2011/16
,2012, New Brighton Beach Scraping Trial: Analysis of Dune and Beach Profile Data, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL TR 2011/26
,2012, Seawall Structure Assessment at Bilgola and Clontarf, Sydney, NSW, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL TR2012/13, https://www.sydneycoastalcouncils.com.au/Project/assessment_and_decision_frameworks_for_seawall_structures_project
,2011, 2D Physical Modelling of Hay Point Coal Terminal 3, Queensland, WRL TR2010/13
,2011, 3D Physical Modelling of Hay Point Coal Terminal, Expansions 3 and 4, Queensland, WRL TR2010/01
,2011, Hunter River Water Quality Model Stage 2: Model Calibration and Verification Report, WRL TR2011/03
,2011, Hunter River Water Quality Model Stage 3: Scenario Modelling, WRL TR2011/23
,2011, Illawarra Ocean Outfall Commissioning Study, WRL TR2006/26
,2011, NSW Coastal Inundation Hazard Study: Coastal Storms and Extreme Waves, WRL TR2010/16, http://www.environment.nsw.gov.au/research-and-publications/publications-search/nsw-coastal-inundation-hazard-study-coastal-storms-and-extreme-waves
,2011, Three Dimensional Physical Modelling of Dalrymple Bay Coal Terminal Apron Widening, WRL TR2006/13
,2010, High Resolution Wave Modelling (HI-WAM) for Batemans Bay Detailed Wave Study, WRL Technical Report 2010/19, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL TR2010/19
,2010, Museum Quay Marina, Darling Harbour: 3D Wave Basin Testing of Entrance Conditions, WRL Technical Report 2007/27, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL TR2007/27
,2010, Three Dimensional Physical Modelling of Dalrymple Bay Coal Terminal Apron Widening, WRL Technical Report 2006/13, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL TR2006/13
,2010, Wavescreen Design Testing at Museum Quay Marina, Darling Harbour, WRL Technical Report 2006/16, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, WRL TR2006/16
,Preprints
2015, The Marine Virtual Laboratory: enabling efficient ocean model configuration, http://dx.doi.org/10.5194/gmdd-8-9741-2015
,