Select Publications
Reports
2021, Hunter River Estuary saline dynamic modelling of Lower Hunter Water Security Plan management scenarios, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2021/11
,2021, King Road Waste Water Treatment Plant: Teal Carbon Project – Phase 2 Conceptual Wetland Design, Water Research Laboratory, School of Civil and Environmental Engineering, Manly Vale, NSW, 2093, WRL TR 2021/14
,2020, Pampoolah Floodplain Remediation Investigation and Riverbank Vulnerability Assessment, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2019/18
,2020, Clybucca Wetlands Management Options Study, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2018/32
,2019, Cost Benefit Analysis of Big Swamp Restoration Project, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2019/19
,2019, Hunter River Catchment Management Scoping Study, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2019/11
,2019, Module-1 Introduction; Climate change in estuaries – State of the science and guidelines for assessment, http://dx.doi.org/10.26190/unsworks/27400
,2019, Module-2 Prioritizing climatic changes; Climate change in estuaries - State of the science and framework for assessment, http://dx.doi.org/10.26190/unsworks/27398
,2019, Module-3 Physical responses to climate change; Climate Change in Estuaries - State of the science and framework for assessment, http://dx.doi.org/10.26190/unsworks/27401
,2019, Module-4: Ecological responses to climate change; Climate Change in Estuaries - State of the science and framework for assessment, http://dx.doi.org/10.26190/unsworks/27406
,2019, Module-5: Managing Local Stressors; Climate Change in Estuaries - State of the science and framework for assessment, http://dx.doi.org/10.26190/unsworks/27405
,2019, Module-7: Physiological Thresholds and Ecological Responses of New South Wales Estuarine Species: A Review; Climate Change in Estuaries - State of the science and framework for assessment, http://dx.doi.org/10.26190/unsworks/27402
,2019, Preliminary Testing of Oyster Clumps, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2019/08, http://dx.doi.org/10.26190/unsworks/27421
,2019, Hunter River Estuary Water Quality Model – Water Quality Model Calibration and Validation Report, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2018/40
,2019, Clyde Terminal Conversion: Restoration of Green and Golden Bell Frog Habitat - Alternate Concept Design and Revised Plan of Management, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2018/15
,2018, Hunter Estuary Wetlands Ramsar Contaminant Transport Modelling, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2018/31
,2018, Everlasting Swamp Hydrodynamic Modelling Study, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2017/02
,2018, Fullerton Cove and Tilligerry Creek Modified Floodgate Design, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2017/18
,2017, Hunter River Estuary Tidal Dynamic Assessment, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2017/01
,2016, Woodberry Swamp Hydrologic Study, Water Research Laboratory, Manly Vale, NSW, WRL TR2016/03
,2016, Teal Lagoon Hydraulic Investigation, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2016/11
,2016, Lower Manning River Drainage Remediation Action Plan, Water Research Laboratory, UNSW Sydney, Manly Vale, WRL TR2016/01, http://dx.doi.org/10.26190/unsworks/27644
,2016, One Tree Reach Wetland: Remediation Option Assessment, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2016/09
,2016, Clyde Terminal Conversion: Restoration of Green and Golden Bell Frog Habitat, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2016/06
,2016, 2015 Riverbank Vulnerability Assessment using a Decision Support System: Seaham Weir Pool and Lower Williams River, Water Research Laboratory, UNSW Sydney, Manly Vale, NSW, WRL TR2015/02, http://dx.doi.org/10.26190/unsworks/27640, https://www.hunterwater.com.au/community/major-projects-in-your-area/seaham-weir-pool-erosion-management-plan
,2016, Preliminary Testing of Oyster Bags, Water Research Laboratory, UNSW Sydney, Manly Vale, WRL TR2015/20, http://www.wrl.unsw.edu.au/sites/wrl/files/uploads/Projects/2016_WRL_2015-20_Preliminary_Testing_of_Oyster_Shell_Filled_Bags.pdf
,2015, Jersey Avenue Wetland Investigation, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2015/06, http://dx.doi.org/10.26190/unsworks/25825
,2014, Detailed Concept Design of Yamba-Iluka Ebb Tide Release, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2008/28
,2014, Riverbank Vulnerability Assessment using a Decision Support System: Clarence River (Rogans Bridge to Ulmarra), Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2014/12, http://maritimemanagement.transport.nsw.gov.au/documents/wrl-report-clarence-river.pdf
,2014, Hunter Valley Hydrodynamic Platform and Model Scoping Study, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2013/26
,2014, Reference list for water-related coal seam gas and coal mining research - Report 3: Australia, Canada, China, India, Russia, The United Kingdom and the United States of America, July 2012 to Sept 2013, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2014/09
,2014, Reference list for water-related coal seam gas and coal mining research – Report 2: United Kingdom, China, Russia and India, January 2000 to June 2012, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2014/08
,2014, Wyong Salt Marsh Investigation, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2013/19
,2014, Riverbank Vulnerability Assessment using a Decision Support System: Lower Hawkesbury River (Wisemans Ferry to Spencer), Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2014/04, http://dx.doi.org/10.26190/unsworks/27646, http://www.hornsby.nsw.gov.au/__data/assets/pdf_file/0009/63774/WRL-Report-2014-04-Final.pdf
,2014, Big Swamp Rehabilitation Project Hydrological Study, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2012/23
,2013, Background Paper on Groundwater Resources in Relation to Coal Seam Gas Production, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL TR2013/09, http://dx.doi.org/10.26190/unsworks/27649
,2013, A Decision Support System to Assess the Impact of Boat Wake Wash on Riverbank Erosion, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL RR245
,2013, Gumma Gumma Swamp Hydrologic Investigation, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale NSW 2093, 2013/03
,2012, Lake Innes Hydrologic Isolation Study, Water Research Laboratory, School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW, 2093, WRL 2012/24
,2012, Rehabilitation of Yarrahapinni Wetlands National Park: Hydrodynamic Modelling of Tidal Inundation, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL TR2011/21
,2012, Riverbank Vulnerability Assessment of the Seaham Weir Pool, Water Research Laboratory, School of Civil and Environmental Engineering UNSW, Manly Vale, WRL TR2012/05
,2011, A Decision Support Tool to Assess the Impact of Boat Wake Wash on River Bank Erosion, WRL TR2006/10
,2011, Anna Bay Drainage: Reducing Acid Water Impacts via Water Control Structures and Tidal Restoration, WRL TR2009/12
,2011, Boat Wake Wash Decision Support Tool Users Manual, WRL TR2007/22
,2011, Burwood Beach Ocean Outfall Data Analysis and Modelling 2009, WRL TR2009/06
,2011, Burwood Beach Ocean Outfall Monitoring: Environmental Conditions Preceding High-Risk Events, WRL TR2009/19
,2011, Estimation of Critical Shear for Transport of In-Sewer Solids Low Flow Sewers Project, WRL TR2011/09
,2011, Illawarra Ocean Outfall Commissioning Study, WRL TR2006/26
,2011, Peer Review of Reports Regarding Erosion at the Detention River, Hellyer, Tasmania, WRL TR2010/26
,2011, Suggested remedial works for Christies Creek to reduce the discharge of aluminium and iron from acid sulfate soils. Final Report, version 1, UNSW Water Research Centre publication 2011/04
,